Tiny homes and RVs
Tiny Home and RV Parking on Private Land: What to Check
Before moving a tiny home or RV onto private land, confirm the unit’s classification, the parcel’s permitted use and the intended length of stay. Owner consent is essential, but it is not planning or zoning approval. Check access, water, wastewater and any required permits before committing.
Browse possible places on the public globe, then sign in to discuss the intended use and unresolved site questions with the member.
1. Separate storage, temporary stays and full-time living
Start with what will happen on the land. Storing an unoccupied RV, hosting occasional overnight visits and using a unit as someone’s full-time home are different proposals. Permission for one does not establish permission for the others.
Describe the number of occupants, overnight frequency, intended dates and whether the unit will remain between visits. San Juan County’s guidance distinguishes storage, temporary use and permanent use; its duration rules are local examples, not limits you can apply everywhere. Ask the relevant authority about your specific arrangement.
Sources: [4]
2. Find out what the unit is classified as
“Tiny home” is a description, not a reliable permit category. Gather the manufacturer’s documents, dimensions, registration or certification, photographs, chassis details and proposed foundation or anchoring plan. Ask whether the authority treats it as an RV, manufactured home, site-built dwelling or another category.
An accessory dwelling unit, or ADU, is a smaller independent dwelling on the same lot as a detached single-family home; a small unit is not automatically an ADU. Portland illustrates the distinction: occupied tiny houses on wheels have a different pathway from structures without wheels.
In the United States, HUD Code manufactured housing has its own standards. Elsewhere, terms such as caravan, motorhome, campervan, secondary dwelling and planning permission may help frame your inquiry. Do not assume those labels carry the same legal meaning across borders.
3. Check the parcel, not just the owner’s willingness
Give the planning or zoning office the parcel identifier, unit information and intended use. Ask whether that use is allowed, which approvals are needed and which building or environmental-health offices must also respond. Request written guidance or the applicable code references.
Ask about vacant-land restrictions, existing dwellings, unit limits, setbacks and site-specific constraints. Portland, for example, does not allow occupied RVs and tiny houses on wheels on undeveloped lots under its residential-lot rules. That is a Portland example, not a universal prohibition. An owner’s invitation cannot replace the relevant approvals.
4. Walk the delivery route and proposed parking area
Before paying for transport or site work, review access with the owner and delivery operator. Check gates, overhead clearance, slopes, ground conditions and room to turn or reverse. Include the tow vehicle and an eventual removal route, not just the parked unit’s footprint.
Mark the proposed location against boundaries, buildings and utility routes. Ask officials which setbacks, fire separation and emergency-access requirements apply. HUD’s installation checklist includes site access, foundation or anchoring and utility hookups; a roomy-looking field alone does not answer those questions.
5. Confirm water, wastewater and power before arrival
Identify a potable-water supply and an approved wastewater arrangement. If an existing septic system is proposed, ask the responsible authority whether it can serve the additional use and what assessment or permission is needed. Do not treat a nearby pipe, drain or tank as approval to connect.
Ask a qualified installer about electrical capacity, connection requirements and permits. Explain any off-grid equipment, composting toilet or holding-tank plan to the relevant office rather than assuming it avoids sanitation requirements. Portland’s occupied-unit rules expressly address potable water, sewer and electrical connections; your location needs its own answers.
6. Use this question set before committing
Keep the responses together with a simple site sketch. Treat unanswered questions as items to resolve, not as permission.
- What is this unit’s official classification, and what documents establish it?
- Is storage, temporary occupancy or residential use allowed on this parcel?
- What duration, occupant or unit limits apply?
- Which permits, inspections and occupancy approvals are required?
- Can the unit enter, turn, sit within required clearances and leave again?
- What water, wastewater and electrical arrangements are acceptable?
- Who will obtain approvals, pay for site work and remove the unit when the arrangement ends?
7. Put the permitted arrangement in writing
A landowner does not need to sell the property. You can discuss a specific permitted parking use, lease or collaboration. Record the area, purpose, dates, payments, utility responsibilities, access, guests, maintenance, insurance questions and removal arrangements.
Agree how changes and disputes will be handled, and what happens if necessary approvals are refused. Get qualified local advice on the agreement, occupancy rights, tax and insurance implications. This guide provides general questions, not personalized legal, tax or zoning advice.
8. Use Land Share Network to start a conversation
Go to the globe, choose an appropriate category and select Filters. Public globe, map and filter browsing is available without sign-in. Open public plot or member pages without signing in; sign in to connect through member messaging. Listing and member information is owner-reported, not verified permission for occupancy.
To offer land, sign in and use the green + Add control in the dock. Describe the specific use you are offering, known limitations and questions still unresolved; use location detail the owner has consented to share. Listings are free to create and keep live, and optional support is not needed for visibility. Hidden or deleted plots stay private. See How to use LSN for instructions.
Questions and answers
Can I live in an RV on my own land?
Ownership alone does not settle occupancy permission. Ask the local authority about the parcel, unit classification, duration and sanitation arrangements. Storage permission is not automatically permission to live there.
Does keeping wheels on a tiny home avoid permits?
Not necessarily. Wheels can affect classification, but occupied units can still face land-use and utility requirements. Ask how the authority classifies your unit and intended use before moving it.
How long can someone stay on private land?
There is no single duration you can safely apply everywhere. Confirm the local definition of temporary use, any day limits and what approvals apply to longer stays. Another county’s rule is not your permission.
Sources: [4]
Do existing hookups mean a site is ready?
No. Confirm potable water, acceptable wastewater disposal and suitable electrical service, including any required permits or inspections. Existing equipment does not establish approval for an additional occupied unit.
Take the next step on Land Share Network
Browse the globe, choose the category that fits your goal and open Filters to narrow the results. Open public plot pages without signing in. Sign in or join to message members or create a listing. To list land, use the green + Add control in the dock. Listings are free to create and keep live.
Listing information is supplied by members. LSN does not grant land-use permission or guarantee ownership, legal suitability, income or a successful arrangement.
Sources
This is general educational information, not legal, tax, insurance or planning advice. Consult a licensed local attorney before entering an agreement, and qualified tax, insurance or planning professionals where relevant. A source from one jurisdiction does not establish the rule elsewhere. Confirm the current requirements for your actual property with the responsible authority.